







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Construction Cost in Mukilteo?
Most significant home construction projects in Mukilteo run between $90,000 and $220,000 when you’re building an addition, finishing an ADU, or combining several rooms into one scope of work. Smaller single-room projects land far below that – a kitchen remodel typically costs $14,000 to $45,000, and a bathroom remodel runs $9,000 to $28,000. Those are typical estimated ranges for the Mukilteo market in 2026; the written estimate you get after a site visit sets the final price.
Mukilteo is a small city with an unusual mix of housing stock: mid-century ranches near the waterfront, newer construction up the hill toward Harbour Pointe, and a lot of homes that have been through one or two partial remodels and are ready for a coordinated one. That mix matters for pricing, because what’s behind the drywall often changes the scope once work starts.
We answer 24/7 at (425) 366-8456, and estimates are free. Fast dispatch from 7am to 7pm, Sunday through Friday.
Key Takeaways
- Whole-home and large-scope construction in Mukilteo: $90,000 – $220,000 typical estimated range.
- Kitchen remodels: $14,000 – $45,000. Small kitchens: $9,000 – $20,000.
- Bathroom remodels: $9,000 – $28,000. Small baths: $5,000 – $12,000.
- Home additions: $45,000 – $130,000. ADU construction: $90,000 – $220,000.
- Roof replacement: $8,000 – $20,000. Window replacement: $4,500 – $15,000.
- Material choice moves the number more than labor in most Mukilteo projects – three engineered-stone countertop brands cost three different amounts.

Construction Cost Breakdown (2026)
Here’s how the numbers break down by project type for Mukilteo homeowners planning a 2026 project. Every figure is a typical estimated range, not a quote.
| Project | Typical Estimated Range |
|---|---|
| Whole-home / large-scope construction | $90,000 – $220,000 |
| ADU construction | $90,000 – $220,000 |
| Home addition | $45,000 – $130,000 |
| Garage conversion | $30,000 – $80,000 |
| Kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Backsplash installation | $800 – $2,500 |
| Bathroom remodel | $9,000 – $28,000 |
| Small bathroom remodel | $5,000 – $12,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement | $3,000 – $8,500 |
| Bathroom vanity installation | $800 – $3,000 |
| Roof replacement | $8,000 – $20,000 |
| Roof repair | $400 – $1,800 |
| Metal roof installation | $15,000 – $40,000 |
| Tile roof repair | $600 – $2,500 |
| Window replacement | $4,500 – $15,000 |
| Vinyl fence installation | $3,500 – $9,000 |
| Aluminum fence installation | $4,000 – $10,000 |
| Paver patio installation | $3,500 – $11,000 |
| Paver driveway installation | $7,000 – $18,000 |
| Concrete driveway installation | $4,500 – $12,000 |
| Asphalt driveway paving | $3,500 – $9,000 |
| Driveway replacement | $5,000 – $14,000 |
| Driveway sealing | $250 – $700 |
What pushes a Mukilteo project toward the top of its range? Three things show up again and again. First, the condition behind the walls and under the floors of older homes – plumbing that’s been patched more than once, wiring that needs updating before new fixtures go in, subfloor that has seen better days. Second, material selection. A kitchen with KraftMaid cabinetry and a Cambria quartz top sits differently on the ledger than one with stock cabinets and laminate, and that’s the whole point of having real brand choices. Third, scope changes that happen mid-project because a homeowner decides to add the flooring or painting while the room is already open – which is usually cheaper than doing it as a separate job later, but still adds to the total.
What pulls a project down? Keeping the existing layout. Moving a sink or a range to the other side of a kitchen means rerouting plumbing and electrical, and that’s labor you can’t see when the job is done. Keeping the footprint of a bathroom and replacing fixtures and finishes instead of reconfiguring the room is one of the largest savings available.
What Affects Construction Pricing in Mukilteo
Mukilteo has some specific conditions that move the number, and they’re worth understanding before you compare estimates.
- Hillside topography and drainage. Homes up the hill toward Harbour Pointe and along the slopes often need grading, retaining, or drainage work before a patio, driveway, or addition can go in. Flat lots near the old town core don’t carry that cost.
- Older housing stock near the waterfront. Mid-century homes around the Mukilteo waterfront and Old Town frequently have original plumbing and electrical that need updating as part of a remodel. That’s not a surprise upgrade – it’s a predictable line item on a home of that era.
- Steep roof pitches and wet winters. Mukilteo gets a lot of rain, and a roof that’s been patched repeatedly will eventually need full replacement rather than repair. Steep pitches slow the work and add labor. A roof replacement here typically runs $8,000 to $20,000.
- Permits and inspections. Additions, ADUs, garage conversions, and structural changes all need permits from the city, and the review and inspection timeline is part of the project schedule. Most cities require a permit for this kind of work, so confirm the specifics with Mukilteo’s building department before work begins – the cost of permits is real and should appear in your estimate.
- ADU and prefab rules. Mukilteo has seen real interest in ADUs and backyard cottages, and a prefab unit from a brand like Abodu or Dvele can be a faster path than site-built construction, depending on the lot and the local rules. ADU construction ranges from $90,000 to $220,000 either way.
- Access and staging. Narrow driveways, tight lots, and limited street parking near the waterfront slow material delivery and add labor hours. A wide lot with room for a dumpster and a material drop is cheaper to work on.
- Material grade. This is where brand choice matters most. James Hardie siding, GAF or CertainTeed roofing, and Cambria, Silestone, or Caesarstone countertops each sit at a different price point, and picking between them is a real decision, not a formality.

How to Save on Construction
There’s no trick to making a $90,000 addition cost $40,000. But there are real ways to keep a Mukilteo project from drifting toward the top of its range.
- Keep the layout. Moving plumbing, gas, and electrical runs is the single biggest controllable cost in a kitchen or bathroom. If the current layout works, keep it.
- Bundle scopes. Painting, flooring, and trim are cheaper when they’re part of the same project as the kitchen or bath, because the room is already open and the crew is already there. One contractor, every scope means one mobilization instead of three.
- Choose materials deliberately, not by default. Get quotes on more than one brand for countertops and cabinetry. The difference between three engineered-stone brands is real, and so is the difference between semi-custom and custom cabinetry. We bring the full lineup – you pick what fits your home and budget.
- Handle exterior work in the same project. If the roof is near the end of its life and you’re already planning window replacement, doing them together usually costs less than two separate jobs.
- Get a written estimate before you commit. A free estimate is the cheapest part of the project and the one that prevents surprise line items. Call (425) 366-8456 for a free estimate – we’ll walk the house with you and put the numbers in writing.
- Plan for what’s behind the wall. Budgeting a contingency for older-home surprises is smarter than discovering them mid-project with no room in the budget.
For a broader look at how we approach projects across the region, see Remodeling Everett.
What Does a Kitchen Remodel Cost in Mukilteo?
A kitchen remodel in Mukilteo typically costs $14,000 to $45,000, with smaller kitchens landing between $9,000 and $20,000. The spread comes down mostly to cabinetry and countertops: cabinet installation runs $4,000 to $13,000, and countertop installation runs $2,000 to $6,500 depending on the material. Adding an island ($3,000 to $10,000) or a new backsplash ($800 to $2,500) moves the total up from there.
The material decision is where most Mukilteo homeowners spend the most time, and that’s fair – it’s the choice they’ll live with every day. Cabinet lines like KraftMaid and Wellborn cover the semi-custom and custom end of the market, and countertops span Cambria, Silestone, and Caesarstone, which lets you match material to budget rather than accepting a one-brand quote. Call (425) 366-8456 for an exact number on your kitchen.
What Does a Bathroom Remodel Cost in Mukilteo?
A bathroom remodel in Mukilteo typically costs $9,000 to $28,000, and a small bathroom remodel runs $5,000 to $12,000. A walk-in shower installation lands between $4,500 and $12,000, a tub-to-shower conversion between $3,500 and $10,000, and a shower replacement between $3,000 and $8,500. A new vanity adds $800 to $3,000.
Bathrooms are the most common first project we’re asked about, and they’re also where older Mukilteo homes show their age. Water damage, old valve bodies, and subfloor softness near the tub are common finds once the tile comes out. A written estimate accounts for what’s visible; the final price is set once the walls are open. Free estimates – call (425) 366-8456.
What Does an Addition or ADU Cost in Mukilteo?
A home addition in Mukilteo typically costs $45,000 to $130,000, ADU construction runs $90,000 to $220,000, and a garage conversion runs $30,000 to $80,000. Those ranges depend heavily on whether the work is site-built or prefab, and on how much site work the lot requires.
Mukilteo’s ADU interest has grown, and we’re one of the few residential remodelers offering ADU and prefab structure installation through multiple modern ADU brands including Abodu, Dvele, Mighty Buildings, Boxabl, and Plant Prefab. A prefab route can be faster than site-built in some cases, but the lot, utilities, and local rules still decide what’s realistic. Permits and city review apply to additions and ADUs, and the timeline is part of the project. For an exact range on your lot, call (425) 366-8456.
What Does Exterior Work Cost in Mukilteo?
Exterior work in Mukilteo has its own set of typical estimated ranges. Roof replacement runs $8,000 to $20,000, with metal roof installation at $15,000 to $40,000. Roof repair lands between $400 and $1,800, and tile roof repair between $600 and $2,500. Window replacement costs $4,500 to $15,000. On the ground, paver patio installation runs $3,500 to $11,000, paver driveway installation $7,000 to $18,000, concrete driveway installation $4,500 to $12,000, asphalt paving $3,500 to $9,000, and driveway replacement $5,000 to $14,000. Sealing an existing driveway is the smallest item at $250 to $700.
Roofing and exterior work in this climate rewards doing it once, correctly. Material partnerships with GAF, CertainTeed, and Owens Corning cover three of the largest roofing manufacturers in North America, so the warranty and material choice are real decisions rather than a single take-it-or-leave-it option. Siding options include James Hardie, entry and impact windows and doors come from Therma-Tru and PGT, and hardscape pavers are available through Belgard, Unilock, Tremron, Techo-Bloc, and Cambridge Pavers. That range means your driveway and patio can match your home rather than the other way around.
One safety note: roof work, especially on steep pitches, is genuinely dangerous and belongs with a trained professional. We don’t recommend homeowner roof access, and we won’t walk you through it step by step. That’s a job for the crew.
Why Work With One Contractor Across Scopes
Most Mukilteo homeowners we talk to have already lived through the alternative: a kitchen contractor, a separate roofer, a separate painter, and a paver crew, all on different schedules, none of them responsible for the others. It works, but it costs coordination time and it leaves gaps where nobody owns the problem.
We handle interior and exterior work under one contractor relationship. Kitchens, bathrooms, flooring, painting, roofing, siding, windows, fencing, and hardscape, all with the same point of accountability. Materials you recognize, work you can verify. From the first tile to the last coat of paint, handled as one project.
Our technicians have up to 15 years of experience, and they’re the people who show up and do the work. One contractor, every scope – from kitchen countertops to ADU additions.
How Do You Choose a Contractor in Mukilteo?
Look for a written estimate with line items, a clear scope, and a plan for what happens if the walls reveal something unexpected. Ask whether the contractor handles permits, whether the sub-trades are vetted and licensed as the state requires, and whether the company can handle multiple scopes or will hand off to someone else mid-project. Get more than one bid – and not just on price. Compare what’s actually included. A bid that’s $5,000 lower because it leaves out the flooring and the paint isn’t lower; it’s incomplete.
And ask about materials. A contractor with real brand access can show you options. A contractor with one supplier can’t. Call (425) 366-8456 and we’ll walk through the full lineup with you.
FAQs – Construction Cost
How much does construction cost in Mukilteo?
Most significant construction projects in Mukilteo run between $90,000 and $220,000, covering whole-home renovations, additions, and ADU construction. Smaller single-room projects cost far less – a kitchen remodel at $14,000 to $45,000 and a bathroom remodel at $9,000 to $28,000. Call (425) 366-8456 for a written estimate – it’s free.
Is it cheaper to repair or replace a roof in Mukilteo?
It depends on the extent of the damage and the roof’s age. A roof repair in Mukilteo runs $400 to $1,800, while a full roof replacement runs $8,000 to $20,000. If the damage is localized and the roof has years left, repair is almost always cheaper. If the shingles are failing across the whole plane, patching becomes a recurring cost. Call (425) 366-8456 for an exact assessment.
How long does a kitchen remodel take in Mukilteo?
A typical kitchen remodel in Mukilteo takes several weeks from demolition to final walkthrough, with the timeline driven by cabinetry lead times and city inspections. Cabins and countertops from brands like KraftMaid and Cambria are ordered ahead and delivered on schedule; delays usually come from behind-the-wall surprises. Call (425) 366-8456 to talk through your timeline.
Do I need a permit for an addition or ADU in Mukilteo?
Yes – additions, ADUs, and garage conversions almost always require a permit, and most cities require one for structural changes. The specifics come from Mukilteo’s building department, so confirm before work begins. Permit cost and review time are real parts of the project budget. Call (425) 366-8456 and we’ll help you understand what’s needed.
Can you handle multiple projects at once?
Yes. We handle interior and exterior scopes under one contractor relationship, so a kitchen remodel and a roof replacement can be scheduled as one project instead of two. That usually saves coordination time and mobilization cost. Call (425) 366-8456 for a free estimate.
If you’re planning a project in Mukilteo and want numbers you can actually budget with, call (425) 366-8456 for a free estimate. We answer 24/7, and fast dispatch from 7am to 7pm, Sunday through Friday, gets a trained technician to your home to walk the project with you. The written estimate is the price that holds – no surprises.
Pricing reflects the Mukilteo market as of 2026. Remodeling Everett offers free estimates – call (425) 366-8456.
Written by the team at Remodeling Everett.
What Our Customers Say
"Excellent build. Costs came in about six percent over the original contract, driven mostly by material price movement during the build, which he documented each time."
- Lisa Rhodes"He was upfront about a soil issue that added cost early rather than absorbing it and surprising us at the end."
- Steve Walsh"Every inspection passed first time. The building department clearly knows him and that made the whole process easier."
- Tracy Barrett












