







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Construction Cost in Shoreline?
Construction work in Shoreline typically runs $90,000 to $220,000 for a full ADU build, which is the largest single project most homeowners here take on. Mid-size renovations land far lower: a kitchen remodel is usually $14,000 to $45,000, a bathroom $9,000 to $28,000, and a roof replacement $8,000 to $20,000. Those are estimated ranges for the Shoreline market in 2026, not quotes. The written estimate you get after we walk your home is what sets the final price.
Shoreline sits on its own set of conditions that push certain numbers around. The city has a deep stock of post-war ramblers and split-levels, many with finished basements and older wiring or plumbing behind the walls. Add the wet winters and the clay-heavy soil in pockets around the area, and you get a market where drainage, moisture control and structural updates often do more to move a budget than the finishes do. We’ll get into that below.
Key Takeaways
- A full ADU build in Shoreline is typically $90,000 to $220,000 in 2026.
- Kitchen remodels land at $14,000 to $45,000, with small kitchens at $9,000 to $20,000.
- Bathroom remodels run $9,000 to $28,000; a small bathroom is $5,000 to $12,000.
- Roof replacement is $8,000 to $20,000; roof repair is $400 to $1,800.
- Home additions range from $45,000 to $130,000 depending on footprint and site work.
- Estimates are free, and the written scope you receive is the number that holds.
- Call (425) 366-8456. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.

Construction Cost Breakdown (2026)
Here’s how the main project types break down for Shoreline homeowners planning a real renovation in 2026. Treat every figure as a typical estimated range over a range of home sizes, ages and finish levels. A 1950s rambler with a hidden surprise behind the drywall and a newer townhome of the same square footage won’t price the same.
| Project | Typical Estimated Range |
|---|---|
| ADU Construction | $90,000 – $220,000 |
| Home Addition | $45,000 – $130,000 |
| Garage Conversion | $30,000 – $80,000 |
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
| Roof Replacement | $8,000 – $20,000 |
| Roof Repair | $400 – $1,800 |
| Metal Roof Installation | $15,000 – $40,000 |
| Tile Roof Repair | $600 – $2,500 |
| Window Replacement | $4,500 – $15,000 |
| Paver Driveway Installation | $7,000 – $18,000 |
| Concrete Driveway Installation | $4,500 – $12,000 |
| Asphalt Driveway Paving | $3,500 – $9,000 |
| Driveway Replacement | $5,000 – $14,000 |
| Driveway Sealing | $250 – $700 |
| Paver Patio Installation | $3,500 – $11,000 |
| Vinyl Fence Installation | $3,500 – $9,000 |
| Aluminum Fence Installation | $4,000 – $10,000 |
We can run several of these scopes under one contractor relationship, so a kitchen and a bathroom don’t get quoted by two different companies with two different schedules. That single point of accountability is a big part of what we do: we’re a full-scope residential remodeling company, and Remodeling Everett brings cabinetry, countertops, roofing, siding, windows, fencing and ADU work together instead of handing you off between trades.
What drives a quote up or down comes down to four things: the condition of the structure behind the finishes, the size of the footprint, the material tier you choose, and how much site work is needed before any of it starts. A bathroom remodel at the low end of the range usually means keeping the existing plumbing layout. Shift the tub and the drain, and you’re climbing toward the top of it. A roof replacement at $8,000 and the same job at $20,000 can be the difference between a straightforward tear-off and finding rotted sheathing that needs replacing once the old material is off.
What Affects Construction Pricing in Shoreline
Shoreline’s housing stock and climate shape the numbers more than most homeowners expect. These are the factors we weigh on nearly every estimate here.
- Age and condition of the home. A large share of Shoreline homes date from the 1940s through the 1970s. That means older wiring, galvanized plumbing, single-pane windows and sometimes asbestos or lead paint that has to be handled before a remodel can proceed. Any of these can move a project from cosmetic to structural, and it’s the single biggest swing factor in a budget.
- Wet-season moisture and drainage. The long rainy season here means waterproofing gets extra attention in bathrooms, basements and crawlspaces. Wet soil against a foundation or a poorly graded yard can turn a simple addition into a drainage project, and we plan for that up front rather than discovering it mid-build.
- Clay-heavy soil in pockets of the area. Where the ground holds water, footing and drainage work for additions, ADUs and driveways can run higher, and driveway surfaces need proper base prep to hold up through freeze-thaw cycles and heavy rain. Paver and concrete work done over a weak base won’t last, so a chunk of a driveway estimate is the base, not the surface.
- Site access and slope. Narrow lots, steep driveways and tight side yards affect how materials reach the work area and how much labor the build takes. A backyard ADU on a slope needs more foundation and grading than one on a flat lot, and that shows in the ADU range.
- Permits and Shoreline’s building review. Most structural work, additions and ADUs require a permit through the city, and plan review takes time. We don’t quote permit or plan-review fees as a fixed number, because they depend on the project and the city’s current schedule, so ask your city’s building department what applies and budget review time into your schedule.
- Material tier and brand choice. This is where you have real control. A cabinet line like KraftMaid or Wellborn, a countertop in Cambria, Silestone or Caesarstone, or a James Hardie versus a standard siding all sit at different price points. We carry 50+ recognized product brands so you can match material to budget rather than accept whatever a single supplier offers.

How to Save on Construction
There’s no trick that makes a full renovation cheap. What there is: a handful of decisions that keep a Shoreline project from drifting past its range. Here’s what actually helps.
Get one clear scope instead of stacking change orders. The written scope is what protects your budget. Change orders placed mid-build, after cabinets are ordered and walls are open, are the most expensive square footage in any project. Spend the time up front deciding finishes, layout and materials, then hold to it.
Keep plumbing and mechanical layouts where they are. Moving a toilet, sink or shower drain in a bathroom, or relocating a range and hood in a kitchen, adds cost fast. A small kitchen remodel at $9,000 to $20,000 is very achievable when the layout stays put; the same room with a moved sink and new electrical drops climbs toward the top of the full remodel range.
Choose an accessible finish tier on the parts no one sees. The wall behind the tile and the structure under the floor should be done right, but the tile you touch doesn’t have to be the most expensive one in the showroom. Being able to pick between three engineered-stone countertop brands, rather than accepting a single supplier’s quote, lets you compare material against budget without sacrificing the look.
Bundle what fits the same visit. Combining work that shares a stage of construction, like a bathroom remodel and the flooring in the hallway outside it, or a roof replacement and window replacement, avoids paying twice for setup and access. Because we handle both interior and exterior scope under one company, those bundles are one plan, not a coordination headache between separate contractors.
Fix small things before they become structural. A roof repair at $400 to $1,800 today is a lot cheaper than the framing and drywall work a slow leak causes through a Shoreline winter. Same with a crack in the foundation or a failing driveway base. Catching the small job early keeps you out of the big-job column.
Start with a free estimate. Call (425) 366-8456 and we’ll walk your home, talk through the scope and give you a written price. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday. Our technicians have up to 15 years of experience, and every project gets the same straight answer about what it takes and what it costs.
FAQs – Construction Cost
How much does an ADU cost in Shoreline?
An ADU build in Shoreline is typically $90,000 to $220,000 in 2026, depending on whether it’s a detached unit, a garage conversion at $30,000 to $80,000, or a prefab structure. We work with ADU and prefab partners like Abodu, Dvele, Mighty Buildings, Boxabl and Plant Prefab to bring more routes to that number, and the written estimate sets the final price. Call (425) 366-8456 for a free, exact quote.
How much does a kitchen remodel cost in Shoreline?
A full kitchen remodel is typically $14,000 to $45,000, and a small kitchen remodel runs $9,000 to $20,000. Cabinets alone are $4,000 to $13,000, countertops $2,000 to $6,500, a backsplash $800 to $2,500 and a kitchen island $3,000 to $10,000. The layout and the cabinet line you choose move the number most. Call (425) 366-8456 for a free estimate.
Is it cheaper to repair or replace my roof in Shoreline?
Repair is almost always cheaper in the short term: a roof repair runs $400 to $1,800, while a full replacement is $8,000 to $20,000. The question is whether the roof has enough life left to make repair worthwhile. If the damage is localized and the shingles have years of service left, repair makes sense; if the roof is near the end of its life or the sheathing is soft underneath, replacing now avoids paying twice. We’ll tell you straight which one you’re facing. Call (425) 366-8456 for a free assessment.
How much does a bathroom remodel cost in Shoreline?
A bathroom remodel is typically $9,000 to $28,000, and a small bathroom remodel is $5,000 to $12,000. A walk-in shower installation is $4,500 to $12,000, a tub-to-shower conversion $3,500 to $10,000, a shower replacement $3,000 to $8,500 and a vanity installation $800 to $3,000. Keeping the plumbing in place is the biggest lever on cost. Call (425) 366-8456 for a free, itemized estimate.
Can you handle both the interior and exterior of my Shoreline project?
Yes. Interior work like kitchens, bathrooms, flooring and painting, and exterior work like roofing, siding, windows, fencing and hardscape, all go through us as one company with one scope. That means one point of accountability from the first tile to the last coat of paint. We carry 50+ recognized brands across those categories, from KraftMaid and Wellborn cabinets to GAF, CertainTeed and Owens Corning roofing to James Hardie siding. Call (425) 366-8456 to talk through what your home needs.
Get a Free Construction Estimate in Shoreline
Shoreline homes have their own quirks: older wiring, wet-season drainage, clay soil and layouts that were never meant for today’s living. That’s exactly the kind of project we’re set up for. We’re a full-scope residential remodeling company that handles the kitchen, the bathroom, the roof and the ADU under one contractor relationship, with access to the brand lines you actually recognize, so you’re choosing between real options instead of taking the only quote you can get.
The estimate is free, the price is set per job by the written scope, and you’ll know what you’re getting into before a single wall comes down. Call (425) 366-8456 for your free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday. If you’re still planning and want to see the full range of what we take on, start with our home remodeling and ADU work, then we’ll build a scope around your home and your budget.
Pricing reflects the Shoreline market as of 2026. Remodeling Everett offers free estimates – call (425) 366-8456.
Written by the team at Remodeling Everett.
What Our Customers Say
"Excellent build. Costs came in about six percent over the original contract, driven mostly by material price movement during the build, which he documented each time."
- Lisa Rhodes"He was upfront about a soil issue that added cost early rather than absorbing it and surprising us at the end."
- Steve Walsh"Every inspection passed first time. The building department clearly knows him and that made the whole process easier."
- Tracy Barrett












