AfterHow Much Does Construction Cost in Bothell?
Most full-scale construction projects in Bothell run between $90,000 and $220,000 in 2026, with ADU construction landing at the top of that band. A typical kitchen remodel sits at $14,000 to $45,000 and a bathroom remodel at $9,000 to $28,000. Those are estimated ranges, not quotes; the written estimate sets the final price.
What separates a Bothell project from the same project in Seattle is rarely the labor rate. It’s the permit calendar, the age of the housing stock, and how much of the work has to happen in the wet months. We’ll walk through all three.

Key Takeaways
- A whole-home transformation or ADU in Bothell typically runs $90,000 to $220,000.
- Kitchens ($14,000 – $45,000) and bathrooms ($9,000 – $28,000) are the two most common starting points.
- Exterior work such as roofing ($8,000 – $20,000) and siding is best scheduled in the dry window.
- Countertop and cabinet choices move a kitchen budget by thousands before a single wall opens.
- Free estimates: call (425) 366-8456. We answer 24/7.
Construction Cost Breakdown (2026)
Below are typical estimated ranges for the projects we’re asked about most in Bothell. Each line covers materials and labor for a standard scope; the number can move either way once your home’s actual conditions are known.
| Project | Typical Estimated Range |
|---|---|
| Full construction project (whole-home or ADU) | $90,000 – $220,000 |
| ADU construction | $90,000 – $220,000 |
| Home addition | $45,000 – $130,000 |
| Garage conversion | $30,000 – $80,000 |
| Kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Backsplash installation | $800 – $2,500 |
| Bathroom remodel | $9,000 – $28,000 |
| Small bathroom remodel | $5,000 – $12,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement | $3,000 – $8,500 |
| Bathroom vanity installation | $800 – $3,000 |
| Roof replacement | $8,000 – $20,000 |
| Roof repair | $400 – $1,800 |
| Metal roof installation | $15,000 – $40,000 |
| Tile roof repair | $600 – $2,500 |
| Window replacement | $4,500 – $15,000 |
| Paver patio installation | $3,500 – $11,000 |
| Paver driveway installation | $7,000 – $18,000 |
| Concrete driveway installation | $4,500 – $12,000 |
| Asphalt driveway paving | $3,500 – $9,000 |
| Driveway replacement | $5,000 – $14,000 |
| Driveway sealing | $250 – $700 |
| Vinyl fence installation | $3,500 – $9,000 |
| Aluminum fence installation | $4,000 – $10,000 |
A few things push a Bothell project toward the top of a range. Opening a wall in a home built before the 1990s often turns up framing that has to be corrected before new work goes in. Moving plumbing or gas is a different job than replacing a fixture in the same spot. And when you choose a Cambria or Silestone countertop and KraftMaid cabinetry, the material line grows faster than the labor line.
Working inside the same house across several scopes typically costs less than hiring separate contractors for each one. When the same company handles the bathroom, the flooring, and the paint, there’s no second mobilization, no overlapping schedules to reconcile, and no argument about whose crew left the mess.

What Affects Construction Pricing in Bothell
Bothell sits in the middle of a region where home prices are high, the housing stock spans several decades, and the weather gives you a narrow window for exterior work. Here’s what actually moves the number.
- Housing age and condition. A lot of Bothell homes date to the 1970s through the 1990s, when the area grew fast. Those homes are usually structurally sound but carry quirks: undersized electrical, older windows, and framing that surprises you once the drywall comes off. None of that shows up until demolition, and a contractor who hasn’t walked the house can’t price it accurately.
- Permit timeline. Structural work, additions, and ADUs require permits through the City of Bothell, and the review period sits at the front of your schedule, not the back. The scope of the permit affects the fee, and the wait affects how long your household lives inside a construction zone.
- Exterior work season. The Pacific Northwest wet season is real. Roofing, siding, painting, and driveway paving all depend on a run of dry days, so exterior projects tend to concentrate into the same stretch of the year. Book early.
- Site access and grading. Bothell lots slope more than people expect. A steep driveway or a backyard that falls away from the house changes what’s needed for excavation, drainage, and retaining walls, and that cost shows up in any hardscape or addition budget.
- Material tier. There’s a wide gap between builder-grade and name-brand. A GAF or CertainTeed roof, James Hardie siding, or a natural-looking quartz surface all add cost over the entry-level alternative. You’re paying for longevity as much as looks.
- Access to older neighborhoods. Homes in the older parts of town can be tight on parking and alley access. If a delivery truck can’t reach the work, material handling takes longer.
How to Save on Construction
The biggest savings in Bothell construction come from decisions made before the first hammer swings, not from shaving the labor bid.
Start with a written, itemized scope. When a contractor hands you a single lump sum, you can’t tell whether the fixtures are Kohler or the discount house brand. Ask for line items on the things that have the widest price spread: cabinets, countertops, plumbing fixtures, roofing, flooring, paint. Once you see the breakdown, you decide where to upgrade and where to stay standard. That’s where the money is.
Bundle alongside work you already need. If the bathroom is coming out anyway, replacing the flooring in the hall while the tile saw is running costs a fraction of a separate visit later. Same for paint: doing the interior while floors are out and furniture is displaced is cheaper than coming back to it in a year.
Pause the additions before you spend. A window you don’t actually need, or a kitchen island that duplicates the counter you already have, is the most common cost creep in a Bothell remodel. A good contractor will tell you what’s structural necessity and what’s a want.
Keep the plumbing where it already sits. Moving a toilet, sink, or shower drain is the single most expensive change in a bathroom, and moving a kitchen sink is the same story there. If your layout can live with the current positions, the plumbing line stays low.
Ask for a free estimate before you commit to anything. Call (425) 366-8456. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday. Estimates are free, the price is set per job by the written estimate, and the written estimate is what you hold us to.
What Does a Full Construction Project Cost in Bothell?
A full construction project in Bothell, whether that’s a whole-home transformation or a detached ADU, typically costs $90,000 to $220,000. That range covers design input, permit work, materials, labor, and the exterior finishes that make the result look finished from the street. Where a project lands depends on square footage, whether you’re building new structure or modifying what’s there, and what materials you select.
An ADU is at the top of the band for a reason. It has its own foundation, framing, roof, utilities, and finishes, plus a separate permit process. The line items are the same as a small house because it is one. Prefab and modular options from ADU brands can shift the timeline and the way the budget is laid out, but not the underlying cost of the structure itself. Call (425) 366-8456 for an exact figure on your plan; the written estimate sets the final price.
What Do Kitchen and Bathroom Remodels Cost in Bothell?
A full kitchen remodel in Bothell typically costs $14,000 to $45,000, and a full bathroom remodel typically costs $9,000 to $28,000. Cabinets, countertops, and fixtures are the three lines that move most, and they’re also the three where real choices save you money.
In the kitchen, cabinet installation runs $4,000 to $13,000 and countertop installation runs $2,000 to $6,500. The gap between those numbers depends on what you pick. Semi-custom cabinets via KraftMaid or Wellborn look and wear differently than builder-grade, and a quartz surface from Cambria or Silestone is a different purchase from laminate. We carry all three of the major engineered-stone brands, so you’re matching material to budget rather than accepting a single supplier’s sheet.
Bathrooms break down the same way. A walk-in shower installation runs $4,500 to $12,000, a tub-to-shower conversion comes in at $3,500 to $10,000, and a bathroom vanity installation is $800 to $3,000. A small bathroom remodel at $5,000 to $12,000 is often the most cost-effective path if the footprint works.
If you’re weighing separate specialty contractors against one company covering the whole scope, that trade-off comes up in every Bothell project we see. The Remodeling Everett approach places interior scopes, cabinetry, countertops, and fixtures under one relationship, so you aren’t chasing three schedules. For more detail on interior scopes in this area, our kitchen and bathroom pages break out the line items further.
What Do Roofing, Siding, and Exterior Projects Cost in Bothell?
A roof replacement in Bothell typically costs $8,000 to $20,000, and roof repair typically costs $400 to $1,800. Siding and exterior paint sit alongside those figures and get priced per project. The reason these numbers vary so much is the roof pitch and the access, not the shingles.
Roofing material affects the number materially. A metal roof installation runs $15,000 to $40,000 and will outlast asphalt, so the annualized cost is closer than the sticker suggests. Roofing lines through GAF, CertainTeed, or Owens Corning each carry their own warranty and lifespan; the choice is as much about the warranty as the color. If you’re scheduling this work in Bothell, plan for the dry months. Roofing in the wet season is slow and risky, and no responsible contractor will promise otherwise.
Siding through James Hardie gives you a fiber cement product that holds paint and resists moisture, which matters in this climate more than in most. Window replacement in Bothell typically costs $4,500 to $15,000. Therma-Tru and PGT entry and impact windows are both available; the impact line is worth considering if window security is a concern. For more on exterior work in the region, our remodeling services overview covers the full scope.
What Do Driveways, Patios, and Hardscape Cost in Bothell?
A paver patio installation in Bothell typically costs $3,500 to $11,000, and a paver driveway installation typically costs $7,000 to $18,000. The driveway number sits higher because it takes more base material, more square footage, and it carries vehicles. Asphalt driveway paving runs $3,500 to $9,000 and concrete driveway installation runs $4,500 to $12,000. Driveway sealing is the smallest line at $250 to $700.
Slope is the wild card in Bothell. A flat lot lets a paver crew work at a steady pace; a stepped lot needs grading, drainage, and possibly retaining walls, all of which show up in the estimate. Hardscape materials from Belgard, Unilock, Tremron, Techo-Bloc, and Cambridge Pavers each have a different cost and look, and the base preparation is where the long-term quality lives. Cheap base work is how pavers end up shifting a season later.
Fencing sits alongside the hardscape work. Vinyl fence installation in Bothell typically costs $3,500 to $9,000 and aluminum fence installation typically costs $4,000 to $10,000. If you’re already doing driveway work, adding a fence or a gate at the same time saves mobilization.
Is Bothell Construction Cheaper If You Do Multiple Scopes at Once?
Yes, typically. Doing several scopes with one contractor in Bothell usually costs less than hiring separate contractors for each, because you pay for mobilization, permits, and project management once instead of three or four times. The bathroom, the flooring, and the paint overlap in time and share a single site supervisor.
That’s the practical difference between a single full-scope contractor and a chain of specialty shops. When the same company installs your KraftMaid cabinets and your Silestone countertop and your Kohler fixtures, those are sequenced properly and no one is blaming anyone else for the delay. Our whole-home remodeling approach also covers the roof, siding, and exterior in the same relationship, which is where the largest savings show up.
What Permits and Code Requirements Apply to Bothell Construction?
Structural work, additions, ADUs, and most plumbing and electrical changes in Bothell require permits through the City of Bothell, and the review period sits at the front of your timeline. Cosmetic work, like painting or replacing a countertop in the same location, typically doesn’t. Your contractor should handle the permit application and schedule the inspections; never let a project start on a “we’ll pull it later” promise.
You’ll want to verify that the local professional is licensed and insured as their state requires before work begins, and ask for the permit scope in writing. It’s the single best way to confirm that what’s being built matches what was approved. Our team answers any permit question during the free estimate; call (425) 366-8456. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
FAQs – Construction Cost in Bothell
How much does construction cost in Bothell in 2026?
A full construction project in Bothell typically costs $90,000 to $220,000, with the top of that band being ADU construction. Individual projects like a kitchen remodel run $14,000 to $45,000 and a bathroom remodel runs $9,000 to $28,000. Call (425) 366-8456 for an exact quote; estimates are free and the written estimate sets the final price.
Is it cheaper to repair or remodel in Bothell?
Repair is usually cheaper in the short term, but it depends on what’s failing. A roof repair at $400 to $1,800 beats a roof replacement at $8,000 to $20,000 if the damage is localized. If the roof is at the end of its life or the underlying decking is compromised, repair is money spent twice. The right call comes from a contractor who has walked the roof and can tell you the remaining service life. Call (425) 366-8456 for an assessment.
Can you handle multiple scopes under one construction project in Bothell?
Yes. Kitchen, bathroom, flooring, painting, roofing, siding, windows, fencing, hardscape, and ADU work can all be sequenced under one contractor relationship. That’s the whole point of a full-scope approach: you get one schedule, one point of contact, and one written estimate. In Bothell, that usually saves money versus hiring separate specialists for each scope. Call (425) 366-8456 to outline your project.
How long does a Bothell construction project take?
A bathroom remodel typically runs several weeks, a kitchen remodel runs longer, and a full addition or ADU runs months. The biggest variable is the City of Bothell permit review, which sits before construction starts, not after. Your written contract should lay out a schedule from permit submission through final inspection. Call (425) 366-8456 to talk through the timeline for your scope.
What brands can I choose from for a Bothell remodel?
We offer 50+ name-brand product lines across every major category. Cabinetry includes KraftMaid and Wellborn. Countertops include Cambria, Silestone, and Caesarstone. Plumbing fixtures include Kohler, Moen, Toto, and Grohe. Roofing includes GAF, CertainTeed, and Owens Corning. Siding includes James Hardie. Windows and doors include Therma-Tru and PGT. Hardscape pavers include Belgard, Unilock, Tremron, Techo-Bloc, and Cambridge Pavers. ADU structures include Abodu, Dvele, Mighty Buildings, Boxabl, and Plant Prefab. Call (425) 366-8456 to talk through the options that fit your home and budget.
Our technicians have up to 15 years of experience, and we’re happy to answer any pricing question before you commit. Call (425) 366-8456 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Pricing reflects the Bothell market as of 2026. Remodeling Everett offers free estimates – call (425) 366-8456.
Written by the team at Remodeling Everett.
What Our Customers Say
"Excellent build. Costs came in about six percent over the original contract, driven mostly by material price movement during the build, which he documented each time."
- Lisa Rhodes"He was upfront about a soil issue that added cost early rather than absorbing it and surprising us at the end."
- Steve Walsh"Every inspection passed first time. The building department clearly knows him and that made the whole process easier."
- Tracy Barrett